S.No |
Client Name |
Projects Name |
Length in Km |
1 |
M/s Vaibhav Infrastucture |
Widening of East Coast Road (ECR) from Double Lane into Four Lane from KM 22/300 to KM 55/800, Including Improvement to Curved Stretches – 13 Nos & Junctions-7 Nos from KM 55/800 to KM 135/500 in Chennai, Tamil Nadu
|
East Coast Road (ECR) |
|
113.2 |
2 |
M/s KNR Constructions Ltd |
Four laning of Jabalpur – Lakhnadon section of NH-7 from km 465.500 to km 546.425 in the State of Madhya Pradesh under NHDP Phase-IV on EPC Mode.
|
NH-7 |
|
80.92 |
3 |
M/s KNR Constructions Ltd |
Four Laning of Rewa-Katni-Jabalpur of NH – 7 (from km 242.600 to km 311.000) inthe state of Madhya Pradesh on Engineering, Procurement and Construction (EPC) mode (Package – I)
|
NH-7 |
|
69.19 |
4 |
M/s KNR Constructions Ltd |
Four Laning of Rewa-Katni-Jabalpur (excluding Katni Bypass) of NH – 7 (from km 311+000 to km 359+500 and from km 378+500 to km 397+000) in the state of Madhya Pradesh on Engineering, Procurement and Construction (EPC) mode (Package – II)
|
NH-7 |
|
69.07 |
5 |
M/s KNR Constructions Ltd |
Four laning of Rewa – Katni-Jabalpur section of NH-7 from km 397.00 to Km 465.500 in the State of Madhya Pradesh under NHDP Phase IV on EPC mode (Package – IV).
|
NH-7 |
|
68.26 |
6 |
M/s KNR Constructions Ltd |
Rehabilitation and Upgradation of Rewa-Sidhi Section of NH-75E from Km.2/8 ti Km.33/2 and from Km.55/4 to Km.83/4 to two lane with paved shoulder with provision of rigid pavement in the state of Madhya Pradesh on Engineering Procurement and Construction (EPC)
|
NH-75E |
|
57.8 |
7 |
M/s IJM (India) Infrastructure Ltd |
Construction of Karalphata Interchange ( From Km. 3.600 to Km 6.000 of NH-4B & From Km 5.300 to Km 6.400 of SH-54 (NH-348A) and Connectivity to Proposed 4th Terminal of JNPT Phase-II ( Package-I).
|
SH-54 |
|
14.65 |
8 |
M/s IJM (India) Infrastructure Ltd |
Construction of Gavanphata Interchange (From Km 14.800 to Km 15.800 of NH-4B, From Km 13.200 to Km 14.850 of SH-54 & from Km 5.400 to Km 6.200 of Amra Marg (NH-348A)) and NH-4B (From Km 6.000 to Km 14.800 and from Km 15.800 to Km 21.200)of JNPT Phase-II (Package –II) on EPC basis.
|
NH-4B |
|
15.127 |
9 |
M/s IJM (India) Infrastructure Ltd |
Construction of SH-54 (NH-348A) from Km 6.400 to Km 13.200 and NH-348A (Amra Marg) from Km 0.000 to Km 5.400 of JNPT Phase II (Package III) on Engineering, Procurement & Construction (EPC) Mode.
|
SH-54 |
|
10.5 |
10 |
M/s IJM (India) Infrastructure Ltd |
Construction of NH 4B from Km 21.200 to Km 27.270 (D to E Section) and from Km 0.000 to Km 4.492 (D to G Section) of JNPT Phase II (Package IV) on EPC Basis.
|
NH-4B |
|
10.2 |
11 |
M/s Babuji Civil Constructions |
Construction of paved shoulder including strengthening of existing carriageway from km 0/8 -51/0 (excluding from km 34/0 to km 39/0) and four laning from 34/0 to km 39/0 in Neyveli Town limit of Cuddalore-Vridhachalam section of NH532 in the state of Tamil Nadu on EPC Mode.
|
NH-532 |
|
55.2 |
12 |
M/s Babuji Civil Constructions |
Rehablitation and upgradation of NH 226 Extn (New NH 136) from km 0/0 to 66/2 to two lane with Paved shoulder in the state of Tamil Nadu on EPC Mode.
|
NH-226 |
|
66.2 |
13 |
M/s JSR Infra Developers Pvt Ltd |
Widening and Strengthening to 4-Lane standard, Existing State Highway (SH37) from Oddanchatram to Avinashpalayam (Approximate length of 69.982 kms) in the State of Tamilnadu on Design, Build, Finance, Operate and Maintain and Transfer on DBFOMT Annuity Basis
|
SH-37 |
|
69.982 |
14 |
M/s. TRIL Roads Pvt Ltd |
Work Order for Technical Study Consultancy / Pre Bid Services for "Four Laning of Tuljapur - Ausa (including Tuljapur Bypass) Section of NH-361 from Km.0.0000 to Km.55.835 (Existing Chainage: Km.416.000 to Km.470.000) under NHDP Phase-IV on Hybrid Annuity Mode in the State of Maharashtra
|
NH-361 |
|
55.835 |
15 |
M/s JSR Infra Developers Pvt Ltd |
Widening the Madurai Ring Road from Double Lane to Four Lane from km 0/0 to km 27/2 on BOT (Toll)”.
|
Madurai_ORR |
|
27.2 |
16 |
M/s. SRK Constructions & Projects Pvt Ltd |
Rehabilitation and Upgradation of KNR/AP Board - Gooty Section from Km.368+920 to Km.424+225 of NH-63 to Four Lane with paved shoulder in the state of Andhra Pradesh under NHDP -IV through engineering, Procurement & Construction (EPC) Basic
|
NH-63 |
|
55.3 |
17 |
M/s. TRIL Roads Pvt Ltd |
Four Laning of Talaja - Mahuva Section of NH-8E from Km.53.585 (Design Chainage Km.54.990) to Km.100.100 (Design Chainage Km.100.45) in the state of Gujarat through Public Private Partnership (PPP) on Hybrid (Annuity) mode (Package II)
|
NH-8E Pkg II |
|
45.46 |
18 |
M/s. TRIL Roads Pvt Ltd |
Four Laning of Mahuva to Kagavadar section of NH-8E from Km.100.100 (design chainage Km.100.450) to Km.139.915 (design chainage Km.140.470) (Package III) in the State of Gujarat through public private partnership (PPP) on Hybrid (Annuity) mode under NHDP Phase IV
|
NH-8E Pkg III |
|
40.02 |
19 |
M/s. TRIL Roads Pvt Ltd |
Four laning of Bhavnagar-Talaja Section of NH-8E from km. 7.090 to km. 53.585 (Design Ch. from km. 6.945 to km. 54.990) (Package–I) in the State of Gujarat to be executed on Hybrid Annuity Mode under NHDP Phase-IV
|
NH-8E Pkg I |
|
48.045 |
20 |
M/s. TRIL Roads Pvt Ltd |
Work Order for Technical Study Consultancy / Pre-Bid Services for Six Laning of Udaipur to Rajasthan / Gujarat Border Section of NH-8 (Length 113.80) Package -5 under NHDP-V in the State of Rajasthan on BOT (Toll) mode
|
NH-8 Pkg V |
|
113.8 |
21 |
M/s. TRIL Roads Pvt Ltd |
Work Order for Technical Study Consultancy / Pre-Bid Services for Six Laning of Km.401.200 to Km.494.410 of NH-8 in the states of Gujarath (Length 93.210) on Hybrid Annuity Basis under NHDP Phase V (Package VI)
|
NH-8 Pkg VI |
|
93.21 |
22 |
M/s. TRIL Roads Pvt Ltd |
Six Laning of Chittorgarh-Udaipur Section of NH-76 from Km 212+000 to Km 118+500 in the state of Rajasthan (Length 93.500 Km) on DBFOT (Toll) mode under NHDP PhaseV Package-III
|
NH-76 Pkg III |
|
93.5 |
23 |
M/s. JMC Constructions Pvt. Ltd |
Rehabilitation and Up-gradation of NH-42 from Km.244/930 to Km.299/775 (Madanapalli -Punganuru-Palamaneru Section) to two lane with paved shoulder in the state of Andhra Pradesh under Corridor Scheme on EPC Mode
|
NH-42 |
|
54.84 |
24 |
M/s. SEW Infrastructure Ltd. |
Rehabilitation and Up-gradation of Mansar-Ramtek-Tumsar-Nawegoan, State Highway from existing km 75+000 (on SH-249, Mansar) to km 144+000 ( on SH-335, Nawegoan)[Design km.0.000 to km. 67.500] (67.500 km). to Two lane with paved shoulders in the state of Maharashtra on EPC Mode- Package 1
|
SH-249 |
|
69 |
25 |
M/s. SEW Infrastructure Ltd. |
Rehabilitation and Up-gradation of Visarwadi (Near junction of NH-6)-Nandurabar- Prakasha ( SH5) State Highway from existing km 0+000 of SH 5,(Vissarwadi) to km 50+260 (Kodle village) [Design km.0+000 to km.50+200] to Two lane with paved shoulders/4 lane in the State of Maharashtra on EPC mode Package 2
|
SH-5 |
|
50.26 |
26 |
M/s. SEW Infrastructure Ltd. |
.Rehabilitation and Up-gradation of Nandurbar (Near Kolde)- Prakasha-Sahada-Khetia ( SH-4 &SH-5) State Highway from existing km 50+260 of SH 5,(Kolde) to km 90+220 (Khetia) [Design km.50+200 to km.98+800] to Two lane with paved shoulders/4 lane in the State of Maharashtra on EPC mode. - Package 3
|
SH-4 & SH-5 |
|
40 |
27 |
M/s.Vishnovi Infratech Limited |
Rehabilitation and Upgradation of Morshi - Chandurbazar- Achalpur highway from km 0/000 to 53/719 to two lanes with paved shoulder in the state of Maharashtra through an engineering, procurement and construction (epc) contract.
|
Morshi-Chandurbazar- Achalpur |
|
53.71 |
28 |
M/s.Vishnovi Infratech Limited |
RFP for “Rehabilitation and up-gradation of Amravati – Nandgaon – Morshi – Warud - Pandhurna National Highway from existing km 52+440 (Morshi) to km 0+000 (Maharashtra / Madhya Pradesh State border upto wardha river bridge) [design km.43.000 to km. 95.390] to two lane with paved shoulders in the state of Maharashtra on epc mode
|
Amravati-Nandgaon- Morshi-Warud-pandhurna NH |
|
52.44 |
29 |
M/S Ksheeraabd constructions Pvt. Ltd |
Rehabilitation and Upgradation of Akola - Deori- Akot- Anjangaon - Achalpur- Betul State Border (Section Akot-Anjangaon) Length 33.10 Km Package NIT/N10
|
Section Akot-Anjangaon |
|
33.1 |
30 |
M/S Ksheeraabd constructions Pvt. Ltd |
Rehabilitation and Upgradation of Wardha on NH-361 to Hinganghat - Jam - Warora (Section Wardha - Hinganghat) Length 36.85 Km Package - NIT/N14
|
Section Wardha - Hinganghat |
|
36.85 |
31 |
M/s KNR Constructions Ltd |
Six Laning & Strengthening of Km.340+000 to Km.403+000 of Hubli - Haveri Section of NH-44 (Old NH-4) in the state of Karnataka under to excecuted on Hybrid Annuity mode under NHDP Phase-V
|
Hubli-Haveri |
|
63 |
32 |
M/s KNR Constructions Ltd |
Six Laning of Chitradurga - Davanagere including Chitradurga bypass (Km.189+000 to Km.260+000) (Design Chainage Km.0+000 to Km.20+700 & Km.208+000 to Km.260+000) of NH-44 (Old NH-4) in the state of Karnataka to be executed on Hybrid Annuity mode under NHDP Phase-V
|
Chitradurga-Davangere |
|
71 |
33 |
M/s Shrem Infraventure Pvt Ltd |
Four Laning of Tuljapur – Ausa (including Tuljapur Bypass) Section of NH-361 from km 0.000 to km 55.835 (Existing Chainage: km 416.000 to km 470.000) under NHDP Phase-IV on Hybrid Annuity Mode in the State of Maharashtra
|
NH361 (Tuljapur-Ausa) |
|
55.835 |
34 |
M/s Patel Engineering Ltd |
Construction of Bypass to Vizianagaram Town of NH-43 (New NH-26) from Km.537.600 to Km.552.000 (Raipur to Vishakhapatnam Section) in the state of Andhra Pradesh for 4 Lane on EPC Basis
|
(Raipur-Vishakhapatnam) |
|
14.4 |
35 |
M/s.Vishnovi Infratech Limited |
Four Laning of Balachera to Harangajo section NH-54 (Ext) from Km.275.000 to Km.244.000 in the State of Assam on EPC Mode
|
NH-54 (Balanchara - Harangajo) |
|
31 |
36 |
M/s IJM (India) Infrastructure Ltd |
Pre- Tender Consultancy Services for Traffic and detailed Engineering (Technical) on Four/Six laning of Solapur- Bijapur of NH 13 ( New NH52) from km 0.0 to 110.542 ( Design length 109.08 km) in the State of Maharashtra and Karnataka to be executed as BOT (Toll) Project on DBFOT Pattern under NHDP Phase - III
|
NH-13 (Solapur - Bijapur) |
|
109.08 |
|
|
|
2007.184 |