S.No |
Client Name |
Projects Name |
Length in Km |
1 |
M/s PSK Infrastructures and Projects Pvt Ltd. |
Detailed Design Consultancy Services” for “Upgrading Malliyakarai – Rasipuram – Thiruchengode – Erode Road (SH 79) km 0/000 to km 30/600 and km 51/400 to km 71/300 in the State of Tamilnadu
|
SH 79 |
|
50.5 |
2 |
M/s SRK Constructions And Projects Pvt Ltd. |
Widening and improvement from Mydukur to Dornala T Jn from Km.589/0 to 641/0 of NH 67 in the State of Andhra Pradesh through Engineering, Procurement and Constructions (EPC) Basis
|
NH-67 Pkg-1 |
|
52 |
3 |
M/s SRK Constructions And Projects Pvt Ltd. |
Rehabilitation and Upgradation of existing NH-67 from Km.641/000 to Km.695/000 (Dornala T Jn to Atmakur Section) to two lane with paved shoulder in the state of Andhra Pradesh under NHDP - IV through EPC Basis Contract.
|
NH-67 Pkg-2 |
|
54 |
4 |
M/s. Sri Balaji Tollways (Madurai) Pvt. Ltd |
Widening the Madurai Ring Road from Double Lane to Four Lane from km 0/0 to km 27/2 on BOT (Toll)”.
|
Madurai ORR |
|
27.2 |
5 |
M/s Adilabad Expressway Pvt Ltd.(SOMA) |
Design, Construction, Development, Finance, Operation and Maintenance four laning of the existing two lane portion divided carriageway facility from Km 175.000 (Mah/TG Border) to Km 230.000 (Islam Nagar) onNH-44(Old NH-7) in the state of Telangana under North-South corridor on Build operation and Transfer (Annuity) Basis Package No. NS2/BOT/AP-6
|
AP-06 (NH-44) |
|
55 |
6 |
M/s KNR Mzaffarpur-Barauni tollway Pvt ltd |
Two laning of Muzaffarpur-Barauni section of , NH-28 From km 519 to km 627 in the state of Bihar on DBFOT(Toll)- EPC contract
|
NH-28 (Toll Plaza admn Building) |
|
0 |
7 |
M/s KNR Mzaffarpur-Barauni tollway Pvt ltd |
Two laning of Muzaffarpur-Barauni section of , NH-28 From km 519 to km 627 in the state of Bihar on DBFOT(Toll)- EPC contract
|
NH-28 (Fly Over at Km.521+43) |
|
0 |
8 |
M/s JKM Infra Projects Limited. |
“Widening and Strengthening of existing Single Lane/Intermediate Lane to Two Lane Carriageway with paved shoulders including geometric improvement from Km.68+260 to Km.118+370 of NH-59 in the State of Odisha”
|
NH-59 |
|
50.11 |
9 |
M/s KNR Mzaffarpur-Barauni tollway Pvt ltd |
Two laning of Muzaffarpur-Barauni section of , NH-28 From km 519 to km 627 in the state of Bihar on DBFOT(Toll)- EPC contract
|
NH-28 |
|
108 |
10 |
M/s KNR Constructions Ltd |
Rehabilitation and upgradation of existing NH-565 from Km 425/400 to Km 509/400 (Penchelakona to Yerpedu section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV through Engineering, Procurement & Construction (EPC) Basis
|
NH-565 |
|
84 |
11 |
M/s Bijapur Hungund Tollway Pvt Ltd, |
Four Laning of Bijapur – Hungund section of NH-13 (New -50) from Km.225.800 to Km.323.015 in the State of Karnataka under NHDP Phase III on Design, Build, Finance, Operate and Transfer (DBFOT) Toll Basis (Packege No: NHDPIII/BOT/KNT/05)
|
NH-50(Old NH13) PUP/CUM-1 No & VUP -1 No |
|
2 |
12 |
M/s SLMI Infraprojects Pvt Ltd |
“Widening from Single lane to Double lane (i) Kodakandla to Jagdevpur road from Km 0/0 to 14/155 (ii) Rayaram to Karkapatla road from Km 0/0 to 25/0 and (iii) Gouraram to Vardarajpur via Pamulaparthi Road from Km 0/0 to 13/5 in Medak District”
|
R&B, Medak dist (Cross Sections & Drawings) |
|
0 |
13 |
M/s KNR Mzaffarpur-Barauni tollway Pvt ltd |
Two laning of Muzaffarpur-Barauni section of , NH-28 From km 519 to km 627 in the state of Bihar on DBFOT(Toll)- EPC contract
|
NH-28 (Toll Plaza admn Building) |
|
0 |
14 |
M/s KNR Mzaffarpur-Barauni tollway Pvt ltd |
Two laning of Muzaffarpur-Barauni section of , NH-28 From km 519 to km 627 in the state of Bihar on DBFOT(Toll)- EPC contract
|
NH-28 (Fly Over at Km.521+43) |
|
0 |
15 |
M/s JKM Infra Projects Limited. |
“Widening and Strengthening of existing Single Lane/Intermediate Lane to Two Lane Carriageway with paved shoulders including geometric improvement from Km.68+260 to Km.118+370 of NH-59 in the State of Odisha”
|
NH-59 |
|
50.11 |
16 |
M/s KNR Mzaffarpur-Barauni tollway Pvt ltd |
Two laning of Muzaffarpur-Barauni section of , NH-28 From km 519 to km 627 in the state of Bihar on DBFOT(Toll)- EPC contract
|
NH-28 |
|
108 |
17 |
M/s KNR Constructions Ltd |
Rehabilitation and upgradation of existing NH-565 from Km 425/400 to Km 509/400 (Penchelakona to Yerpedu section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV through Engineering, Procurement & Construction (EPC) Basis
|
NH-565 |
|
84 |
18 |
M/s Bijapur Hungund Tollway Pvt Ltd |
Four Laning of Bijapur – Hungund section of NH-13 (New -50) from Km.225.800 to Km.323.015 in the State of Karnataka under NHDP Phase III on Design, Build, Finance, Operate and Transfer (DBFOT) Toll Basis (Packege No: NHDPIII/BOT/KNT/05)
|
NH-50(Old NH13) PUP/CUM-1 No & VUP -1 No |
|
2 |
19 |
M/s SLMI Infraprojects Pvt Ltd |
“Widening from Single lane to Double lane (i) Kodakandla to Jagdevpur road from Km 0/0 to 14/155 (ii) Rayaram to Karkapatla road from Km 0/0 to 25/0 and (iii) Gouraram to Vardarajpur via Pamulaparthi Road from Km 0/0 to 13/5 in Medak District”
|
R&B, Medak dist (Cross Sections & Drawings)0 |
|
0 |
20 |
M/s KNR Constructions Ltd |
“Improvement/Augmentation of Four Laning from [Design Chainage Km 5.000 to Km 81.000] and Two Laning with Paved Shoulders from [Design Chainage KM 81.000 to Km 120.000] of Madurai – Ramanathapuram section of NH-49 [Total Design Length 115.000 KM]
|
NH-49 |
|
115 |
21 |
M/s NSPR-KMC Joint Venture |
Rehabilitation and Upgradation of NH-42(old NH205) from Km 134/000(old Km 58/0) to Km 202/050(old Km 126/0) ( Mudigubba to Ananthapuram Dist Border section) tto two lane with paved shoulders in the state ofAndhra Pradesh under Corridor Approach plan on EPC Basis contract
|
AP-06 (NH-42) |
|
68 |
22 |
M/s Qingdao Construction Group Co Ltd |
“Four Lanning from Km.4/8 to Km.24/6 of Nizamabad – Jagdalpur section of NH-63 (Old NH-16) in the state of Telangana under NH[O] on EPC mode”.
|
NH-63 (Nizamabad-Jagdalpur) |
|
19.8 |
23 |
M/s KNR Constructions Ltd |
Improvement / Augmentation of Four Laning of existing Thiruvananthapuram Bypass and continuing the bypass with new alignment further as alternative road for existing NH 47 from Kazhakkoottam (Thiruvananthapuram) to Mukkola Junction (km 0.00 to km 26.50) under NHDP Phase IIIA in the State of Kerala on EPC mode.
|
NH-47 |
|
26.5 |
24 |
M/s Sri Venkateswara Constructions |
Widening Carriageway to two lane from Km.215/0 to 231/0 and 236/0 to 247/0 of Hyderabad – Bhupalapatnam section of NH-163(Old NH-202) in the State of Andhra Pradesh, through an Engineering, Procurement & Construction (EPC) Basis Contract
|
NH163 |
|
27 |
25 |
M/s Sri Venkateswara Constructions |
Construction of High level Bridge at Km.69/8-10, Km 79/8-10 and at Km98/8-10 of Sironcha- Athmakur road NH-363 in Andhra Pradesh under Annual plan 2013-14. - through an EPC Basis Contract.
|
NH363 |
|
3 |
26 |
M/s Infra Design Innovation Pvt Ltd (D P Jain & Co) |
Widening to two/four lane with Paved Shoulder of NH-150 Section from End of Yadgir Bypass Km.79.650 (Existing Km. 85/880) to Km.118.470 ( Existing Km.125/300) to Andhra Border in the State of Karnataka on EPF Mode
|
NH-150 (Yadgir Bypass) |
|
38.82 |
27 |
M/s. TRIL Roads Pvt Ltd |
Six Laning of Chittorgarh-Udaipur Section of NH-76 from Km 212+000 to Km 118+500 in the state of Rajasthan (Length 93.500 Km) on DBFOT (Toll) mode under NHDP PhaseV Package-III
|
NH-76 Pkg III |
|
93.5 |
28 |
M/s Raj Promotors Private Limited |
Four laning from Km.153.000 to Km.175.000 of Nagpur - Hyderabad Section of NH-7 in the State of Maharashtra - on item rate mode - Design of Super Structure VUP 2 nos & Major Bridges 1 no
|
NH-7 (Nagpur-Hyderabad) |
|
0 |
29 |
M/s GKC Projects Limited |
Four Lanning of Raipur-Kodebad Section from Km. 10.200 to Km. 43.400 of NH-43 in the state of Chhattisgarh under NHDP phase-iv on Engineering, Procurement & Construction EPC (Mode)
|
NH-43 (Raipur-Kodebad) |
|
32.2 |
30 |
M/s GKC Projects Limited |
Four Lanning of Kodebad-Dhamtari Section from Km. 43.400 to Km. 82.209 of NH-43 in the state of Chhattisgarh under NHDP phase-iv on Engineering, Procurement & Construction EPC (Mode)
|
NH-43 (Kodebad-Dhamtari) |
|
38.809 |
31 |
M/s IJM (India) Infrastructure Ltd |
Widening & Up-gradation of Dewas Bypass road from Km 0+000 at Ujjain Dewas Junction and Ends at Km 19+800 of Indore Junction to Four / Six laning of in the State of Madhya Pradesh on DBFOT basis
|
Dewas Bypass |
|
19.8 |
32 |
M/s KMV Projects Limited |
Rehabilitation and Upgradation to Two Lane with Paved Shoulders from Km 0/000 to km 72/600 of NH- 365 from Nakrekal to Tanamcherla Road in the State of Telangana
|
NH-365 (Nakrekal) |
|
72.6 |
33 |
Divisional Engineer (H), Projects, Salem |
Preparation of Detailed Project Report in Bus Stand Arm for the main work of "Construction of Grade Separator at Km.1/8 of Erode - Perundurai - Kankeyam road near Government Hosipital"
|
Erode Bus Stand Arm |
|
0 |
34 |
M Surya Narayana Reddy |
Proposed ROB No 5 at Ch.7386.00 m As 1 x 24.0 M Psc Girder Over State Highway Between Piduguralla (New) and Nekarikallu Stations
|
Piduguralla - Nekarikallu |
|
0 |
35 |
M/s HES Infra Private Limited |
Widening to 2/4 Lane with Paved shoulders from Km 182.120 to Km 227.600 of NH 167 on Haggari to Jadcherla road on Engineering, Procurement & Construction (EPC) mode under NH (O) in the state of Telangana"
|
NH-167 (Haggari to Jadcherla) |
|
45.48 |
36 |
M/s Reliance Infrastructure Limited |
Improvement / Augmentation of Vikkaravandi - Pinalur - Sethiyahopu Section of NH-45C with Four Lane from Km.0.000 to Km.60.250 (Design Length 65.960 km) under NHDP-IV in the statte of Tamilnadu
|
NH-45C (Vikkaravandi - Pinalur - Sethiyahopu) |
|
60.25 |
37 |
Divisional Engineer (H), Projects, Salem |
Preparation of Detailed Project Report for the work of Construction of Elevated Bridge for a length of 5.40Km from Kalingarayan Illam to Thindalmedu (Km.2/0 to Km.7/4 of Erode –Perundurai – Kangeyam road)
|
Kalingarayan Illam to Thindalmedu |
|
5.4 |
38 |
M/s EKK Infrastructure Limited |
Four - Laning Of Thalassery - Mahe Bypass Section Of NH-17 From Km 170.600 (design Chainage 170.600) To Km 188.000 (design Chainage Km 189.200) Under NHDP Phase-III On EPC Mode in the State Of Kerala
|
Thalassery-Mahe Bypass (NH-17) |
|
18.6 |
|
|
|
1411.679 |