S.No |
Client Name |
Projects Name |
Length in Km |
1 |
M/s JKM Infra Projects Limited. |
“Widening and Strengthening of existing Single Lane/Intermediate Lane to Two Lane Carriageway with paved shoulders including geometric improvement from Km.68+260 to Km.118+370 of NH-59 in the State of Odisha”
|
NH-59 |
|
50.11 |
2 |
M/s KNR Mzaffarpur-Barauni tollway Pvt ltd |
Two laning of Muzaffarpur-Barauni section of , NH-28 From km 519 to km 627 in the state of Bihar on DBFOT(Toll)- EPC contract
|
NH-28 |
|
108 |
3 |
M/s KNR Constructions Ltd |
Rehabilitation and upgradation of existing NH-565 from Km 425/400 to Km 509/400 (Penchelakona to Yerpedu section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV through Engineering, Procurement & Construction (EPC) Basis
|
NH-565 |
|
84 |
4 |
M/s PSK Infrastructure and Projects Pvt Ltd |
Detailed Design Consultancy Services” for “Upgrading Malliyakarai – Rasipuram – Thiruchengode – Erode Road (SH 79) km 0/000 to km 30/600 and km 51/400 to km 71/300 in the State of Tamilnadu
|
SH 79 |
|
50.5 |
5 |
M/s SRK Constructions And Projects Private Limited |
Widening and improvement from Mydukur to Dornala T Jn from Km.589/0 to 641/0 of NH 67 in the State of Andhra Pradesh through Engineering, Procurement and Constructions (EPC) Basis
|
NH-67 Pkg-1 |
|
52 |
6 |
M/s SRK Constructions And Projects Private Limited |
Rehabilitation and Upgradation of existing NH-67 from Km.641/000 to Km.695/000 (Dornala T Jn to Atmakur Section) to two lane with paved shoulder in the state of Andhra Pradesh under NHDP - IV through EPC Basis Contract.
|
NH-67 Pkg-2 |
|
54 |
7 |
M/s. Sri Balaji Tollways (Madurai) Pvt. Ltd |
Widening the Madurai Ring Road from Double Lane to Four Lane from km 0/0 to km 27/2 on BOT (Toll)”.
|
R&B, Madurai ORR |
|
27.2 |
8 |
M/s. Sri Balaji Tollways (Madurai) Pvt. Ltd |
Four Laning of Bijapur – Hungund section of NH-13 (New -50) from Km.225.800 to Km.323.015 in the State of Karnataka under NHDP Phase III on Design, Build, Finance, Operate and Transfer (DBFOT) Toll Basis (Packege No: NHDPIII/BOT/KNT/05)
|
NH-50(Old NH13) PUP/CUM-1 No & VUP -1 No |
|
2 |
9 |
M/s IJM Infrastructure |
Widening & Up-gradation of Dewas Bypass road from Km 0+000 at Ujjain Dewas Junction and Ends at Km 19+800 starts at Indore Junction to Four / Six laning of in the State of Madhya Pradesh on DBFOT basis
|
Dewas Bypass |
|
19.8 |
10 |
M/s Raj Promoters and Civil Engineers Pvt Ltd |
Balance work of four laning from Km.153.000 to Km.175.000 of Nagpur - Hyderabad Section of NH-7 in the State of Maharashtra - on item rate mode
|
NH-7 (Nagpur-Hyderabad) |
|
0 |
11 |
M/s KMV Projects Limited |
Rehabilitation and Upgradation to Two Lane with Paved Shoulders from Km 0/000 to km 72/600 of NH- 365 from Nakrekal to Tanamcherla Road in the State of Telangana
|
NH-365 (Nakrekal) |
|
72.6 |
12 |
M/s HES Infra Private Limited |
Widening to 2/4 Lane with Paved shoulders from Km 182.120 to Km 227.600 of NH 167 on Haggari to Jadcherla road on Engineering, Procurement & Construction (EPC) mode under NH (O) in the state of Telangana"
|
NH 167 |
|
45.48 |
13 |
SE , Coimbatore |
Preparation of Detailed Project Report for the work of Construction of Elevated Bridge for a length of 5.40Km from Kalingarayan Illam to Thindalmedu (Km.2/0 to Km.7/4 of Erode –Perundurai – Kangeyam road)
|
Erode |
|
5.04 |
14 |
Divisional Engineer (H), Projects, Salem |
Preparation of Detailed Project Report in Bus Stand Arm for the main work of "Construction of Grade Separator at Km.1/8 of Erode - Perundurai - Kankeyam road near Government Hosipital"
|
Erode Bus Stand Arm |
|
1 |
15 |
M/s Adilabad Expressway Pvt Ltd |
Desing, Construction, Development, Finance, Operation and Maintenance of Km.175.000 (Mah/Telangana Border) to Km.230.000 (Islamnagar) on NH-44 in the state of Telangana
|
NH-44 |
|
55 |
16 |
M/s Sri Avantika Contractors (I) Limited |
Construction of 2 lane with paved shoulder from Km.168.000 to Km.168.000 to Km.183.783 (Yesmong to Unger) on Mokkochung to Tuli Section of NH-61, Nagaland State
|
NH-61 (Nagaland) |
|
15.783 |
17 |
M/s KNR Constructions Ltd |
Four laning of NH-161 from Ramsanpalle village (Design Km 39.980/Existing Km 44.757) to Mangloor village (Design Km 86.788/Existing Km 91.350) (Design Length -46.808 Km) in the State of Telangana under Bharatmala Pariyojana on Hybrid Annuity Mode
|
NH-161 (Ramsanpalle-Mangloor) |
|
46.808 |
18 |
M/s KNR Constructions Ltd |
Six laning of NH-140 from Chittor (Design Km 0.000/Existing Km 158.000 of NH-4) to Mallavaram (Design Km 61.128/Existing Km 41.800 of NH-140) (Design Length = 61.128 Km) in the State of Andhra Pradesh under Bharatmala Pariyojana on Hybrid Annuity Mode
|
NH-140 (Chittor - Mallavaram) |
|
61.128 |
19 |
M/s Patel KNR JV |
Design, Construction, Development, Operation, Finance and Maintenance of Islam Nagar (Km.230.00) t oKadtal (Km.278.00) of Nagpur - Hyderabad Section on NH-7 in the State of Andhra Pradesh, Under North - South Corridar (NHDP Phase-II0 on BOT (Annuity) Basis
|
NH-7 (Nagpur - Hyderabad) |
|
48 |
20 |
M/s VDB Projects Pvt Ltd & Sri Venkateswara Constructions |
Widening and Strengthening of existing 2-lane to 2-lane with paved shoulders from Km 159/0 to 165/4 and Km 186/0 to 215/0 of NH-163 in the State of Telangana on EPC mode
|
NH-163 |
|
35.4 |
21 |
M/s EKK Infrastructure Limited |
Four - Laning Of Thalassery - Mahe Bypass Section Of NH-17 From Km 170.600 (design Chainage 170.600) To Km 188.000 (design Chainage Km 189.200) Under NHDP Phase-III On EPC Mode in the State Of Kerala
|
Thalassery-Mahe Bypass (NH-17) |
|
17.4 |
22 |
M/s PLR Projects Private Limited |
Four Laning of Imphal – Moreh Section of NH 39 from Km 330+000 to 350+000 in the State of Manipur (Package I)
|
Imphal - Moreh NH-39 |
|
20 |
23 |
M/s SPK & CO |
Six Lanning of Karaipettai to Walajapet Section of NH-4 (New NH-48) from Km.71+015 (Existing Km 71/000) to Km 107+091 (Existing Km 107/068) on EPC Mode in the state of Tamil Nadu under NHDP Phase-V
|
Karaipettai to Walajapet |
|
36 |
24 |
D.P Jain & Co. Infrastructure Pvt Ltd |
Four Laning of Madathukulam - Pollachi section of NH-209 (New NH-83) from Design Km. 74.380 to Km. 116.950 (Total Length – 50.078 km) under Bharatmala Pariyojana Phase-I under the category of Residual Works of NHDP on HAM in the State of Tamil Nadu
|
Madathukulam - Pollachi |
|
42.57 |
25 |
M/s JSR Infra Ltd |
Construction of Four Lane divided Highway from Melur (Design Km.0.000/ Existing Km.99.920 of NH-38) to Karaikudi (Design Km.45.855/ Existing Km.12.900 of NH-383 Ext.)Design Length Km.45.855 Km) in the State of Tamil Nadu under Bharatmala Pariyojana on EPC
|
Melur to Karaikudi |
|
45.85 |
26 |
M/s KNR Constructions Limited |
Four Laning of Trichiraopalli (Km.0.000) to Kallagam (Km.38.700) Section of NH-227 on Hybrid Annuity Mode in the State of Tamil Nadu under NHDP Phase IV
|
Trichiraopalli- Kallagam |
|
38.7 |
27 |
M/s Anusha Projects Private Limited |
Widening and Strengthening / Reconstrution of existing pavement to Four lne with paved shoulders from Km.266.348 to Km.283.000 of Mahabubnagar-Jadcherla section of NH-167 on EPC mode in the state of Telangana
|
Mahabubnagar - Jadcherla |
|
16.65 |
28 |
M/s Brij Gopal Construction Company Pvt Ltd |
4-Lanning of Jind - Gohana (Pkg-I) section (Greenfield Alignment) from Km.0.000 to Km.40.601( Length 40.601 Km) of NH-352A in the State of Haryana under NH(O) on Hybrid Annuity Mode
|
Jind-Gohana |
|
40.601 |
29 |
M/s JMC Constructions Pvt Ltd |
Rehabilitation and Upgradation of Chittoor - Kurnool Road NH-18 (New NH-40) from 2 lane to 4 lane from Km.4/14 to Km.18/34 (Excluding 2.94 km ROB Portion) from Murkumbattu Junction to Rangampet Cross in the state of Andhra Pradesh under Corridor approach Through EPC mode under NH(O)
|
Chittoor-Kurnool Road |
|
14.2 |
30 |
M/s P Venkateswara Rao |
Widening of Bottelneck at Punjagutta Grave for rectification of Black spot area under T &T GHMC
|
Punjagutta |
|
0.2 |
31 |
M/s P Venkateswara Rao |
Improvement of Radial Road No.30 i.e. from Hyderabad Central University Depot to Vattinagulapply Village on Outer Ring Road in Ranga Reddy District – (Part of the work with Drawn under Clause 60 @ of APDSS)
|
Goppanapalli |
|
1.3 |
32 |
M/s Anusha Projects (P) Ltd |
Widening of existing single/ intermediate lan road to 2 lane road from Km.83.00 to Km.101.00 on NH-61 in the state of Nagaland
|
Nagaland (NH-61) |
|
18 |
33 |
M/s D.P Jain & Co. Infrastructure Pvt Ltd |
4-Laning of Nagpur - Umred section from Km.7+300 to Km.48+400 (Package -I) of NH-353D in the state of Maharashtra on EPC mode - Detailed Design Consultancy services for Major Bridges (4 Nos) and VUP (1 No)
|
Nagpur-Umred |
|
1 |
34 |
M/s KNR Constructions Ltd |
Four laning of Oddanchatram - Madathukulam section of NH-209 (New NH 83) (Design Ch Km.29.000 to Km 74.380) under Bharatmala Pariyojna Phase-I under the category of Residual works of NHDP on HAM in the state of Tamil Nadu
|
Oddanchatram - Madathukulam (NH-209) |
|
45.38 |
35 |
M/s HG Infra Engineering Ltd |
Four laning of NH-363 from Mancherial Design Km 0.000 Existing Km 251.900 to Repallewada Design Km 42.000 Existing Km 288.510 Design Length 42.000 Km in the State of Telangana under NHDP Phase-IV under Bharatmala Pariyojana on Hybrid Annuity Mode
|
Mancherial - Rapallewada (NH-363) |
|
42 |
36 |
M/s J Kumar Infraprojects Ltd |
Construction of Dwarka Expressway between design chainage 5+300 and 9+500 (Package 2) in State of Delhi
|
Dwaraka Expressway |
|
4.2 |
37 |
M/s P Venkateswara Rao |
Steel Bridge To Provide access Road Into Panjagutta Graveyard Opp: Chutneys And For Development Of Exit road For Graveyard From Road No.1 Side
|
Panjagutta |
|
0.1 |
38 |
HG Infra Engineering Ltd |
Construction of Proposed Rewari Bypass (designed length 14.4 km) as a Feeder Route in the state of Haryana on Hybrid Annuity Mode
|
Rewari Bypass |
|
14.4 |
39 |
M/s CEIGALL |
Construction of Six-Lane access controlled highway (NH-152D) starting from Ismailabad on NH-152 to Junction with Karnal- Pehowa road (SH-9) near Dhand [Ch. 0+000 to Ch. 23+000 length 23 km] section of NH-152D Greenfield Alignment on EPC Mode under BharatmalaPariyojana in the State of Haryana
|
Ismailabad - Karnal - Pehowa Road |
|
23 |
40 |
M/s R&B, Warangal |
Detailled Design Engineering Consultancy Services for Exit Road Flyover of 6-Lane Ring Road at Yadadri in Yadadri - Bhuvangiri District
|
Yadadri Exit Road Flyover |
|
06 |
41 |
M/s Sadbhav Engineering Ltd |
Four Laning of Bijapur - Hungund Section of NH-13 from Km.102.000 to Km.202.000 in the State of Karnataka under NHDP Phase III on Design, Build, Finance, Operate and Transfer ("DBFOT") Toll Basis (Package No NHDP-III/BOt/KNT/05) - Detailed Engineering Surveys & Design of Service Road / Structure at Hittanhanalli Villaage
|
Bijapur - Hundund |
|
1.1 |
42 |
M/s Anusha Projects (P) Ltd |
Rehabilitation and Upgradation to 2-lane with paved shoulders of Rulcham - Dulte section (Economic Corridor) of NH-6 from existing chainage Km.50+360 (Rulcham) to Km.69+015 (Dulte) (Design Chainage Km.45+040 to Km.62+200) (Pack -IV) in the state of Mizoram under Bharatmala Pariyojana on EPC mode
|
Rulcham - Dulte Section (Mizoram) |
|
18.6 |
43 |
M/s R&B, Warangal |
Forming 6 Lane Ring Road around Yadadri Temple along with new Ghat road landing towards N-E 1st Flyover Near 1st Ghat Road
|
Yadadri Bhongir - 1st Flyover |
|
0.4 |
44 |
M/s KCP Engineers Pvt Ltd |
Construction of flyover at Km.362/790- 364/555 of (Nagapattinam - Gudalur - Mysore Road) Periyanaickenpalyam Junction - Coimbatore - Outskirt in the state of Tamilnadu on EPC
|
Flyover Bridge at Periyanaickenpalayam |
|
1.76 |
46 |
M/s Megha Engineering & Infrastructures Ltd |
Six Laning of Chengala to Neeleshwaram section of NH-17 (New NH-66) from Ch. 56+200 (existing Km.57+200) to Ch.93+468 (existing Km 95+650) Total length 37.268 km in the State of Kerala on Hybrid Annuity Mode under Bharatmala Pariyojna in the Category of residual works under NHDP
|
Chengala to Neeleshwaram |
|
38.45 |
47 |
M/s Megha Engineering & Infrastructures Ltd |
Six Laning of Neeleshwaram to Thaliparambha section of NH-17 (New Nh-66) from Ch.94+540 (existing Km.96+450) to Ch.134+650 (existing Km.137+900) in the State of Kerala on Hybrid annuity mode under Bharatmala Pariyojna in the Category of residual works under NHDP
|
Neeleshwaram to Thaliparambha |
|
43.36 |
48 |
M/s Megha Engineering & Infrastructures Ltd |
Six Laning of NH-71 from Renigunta (Start at junction of NH-71, NH-18A,NH-205 MDR of Renigunta) (Design Km.0.000/ /Existing Km.124.600 of NH-71) to Naidupeta (End on NH-16) Design Km.57.046/ Existing Km.183+400 of NH-71) (Design Length = 57.046 Km) on Hybrid Annuity mode in the State of Andhra Pradesh under Bharatmala Pariyojana
|
Renigunta - Naidupeta |
|
57.046 |
49 |
M/s RPP- Dhanya (JV) |
Upgrading Kanchipuram - Arakkonam - Thiruthani Road section of SH-58 from km 66.940 to km 86.345, km103.260 to km 108.719 and construction of Arakkonam bypass from km 86.345 to km 103.260 (16.915km) to two (2) lane with paved shoulders for a total length of 41.779 km and maintenance of entire project stretch for 7 years in the State of Tamil Nadu on Engineering, Procurement and Construction (EPC) Mode Annuity mode
|
Kanchipuram-Arakkonam- Thiruthani |
|
41.779 |
50 |
M/s RPP- Renaatus (JV) |
Upgrading of Malliyakarai – Rasipuram – Tiruchengode - Erode Road (SH 79) from km 83/350 to km 91/100 to Four lane with paved shoulders and Construction of Two Lane Elevated Corridor from Ch. 91/100 to Km 94/170 including Service road on either side and providing ramp to Sankagiri Pallipalayam Road from km 15/367 to km 15/700 (Design Chainage 0/000 to 0/333) and maintenance of entire project stretch of 11.153 km for a period of 7 years
|
Malliyakarai – Rasipuram – Tiruchengode - Erode Road |
|
11.1 |
51 |
M/s Krishi Infratech |
Construction of Bridge across Tunga river at Km.207.80 of NH 206 Tumkur - Honnavara section in the state of Karnataka on Engineering, Procurement & Construction (EPC) Basis
|
Bridge acroos Tunga River |
|
1 |
52 |
M/s Krishi Infratech |
Construction of Two lane steel composite ROB at Km.525.00 of NH-13 Chitradurga - Shimoga section in lieu of LC-46 (Railway Chainages Km.60.830) in the state of Karnataka on EPC mode
|
ROB - Chitradurga - Shimoga |
|
1 |
53 |
M/s Krishi Infratech |
Construction of 4 lane ROB at Km.4/0 - 4/1 between Gudivada - Nujella Station on Gudivada - Machilipatnam section ata N.H Km.10+906 on Pamarru and Alapadu Bypass road of NH-165 in Krishna District i the state of Andhra Pradesh
|
Gudivada - Machilipatnam |
|
0 |
54 |
M/s KUDA Warangal |
1. Widening of existing BT road to double lane (two lane) in Jawahar colony junction at Gopalpur village, Hasanparthy (M), Warangal (U) District - Package I - 7.23 Km.
2.Formation of BT road from MAA Township to Anantha Sagar Village to meet Karimnagar Warangal road, Hasanparthy (M) Warangal (U) District - Package -II - 6.52 Km
|
Gopalpur Village & Anantha Sagar Village |
|
13.75 |
|
|
|
1485.345 |