   Claim Management Services - Ongoing Projects
S.No Client Name Projects Name

1

M/s Techtrans Construction India Pvt Ltd & KCPL (JV)

Construction of existing carriageway from km 135.800 to km 218.000 on Trichy Karur section of NH-67 in the state of Tamil Nadu NH67

2

M/s Patel-KNR (JV)

Four laning and strengthening of existing two lane of NH-7 from km 169.300 to km 211.230 of Madurai-Kanniyakumari section of NH-7 in Tamilnadu (Contract Package NS-43 /TN) NS43

3

M/s Patel-KNR (JV)

Four laning and strengthening of Existing two lanes from Km. 0.00 to 42.00 of Madurai - Kanyakumari Section of NH-7 in Tamilnadu – Contract Package No. NS-39/TN NS39

4

M/s Patel-KNR (JV)

Four laning and Strengthening of the Existing 2-lane from Km.203.000 to Km.234.690 of Madurai to Kanyakumari Section of NH-7 in the state of Tamil Nadu Contract Package No. NS-32/TN(Balance) NS32

5

M/s Patel-KNR (JV)

Widening and strengthing of Existing National Highway from 2 laneCarriageway of NH-37 from Km 262.725 to Km 255.00 and Nagaon Bypass in AssamContract Package No.EW - II (AS - 18 ) AS18

6

M/s Patel-KNR (JV)

Widening and strengthening of existing National Highway from Km. 22.000 to Km. 40.000 (NH-54E) of Lanka to Lumding section of NH-54 in Assam on East West Corridor under Phase-II Programme of NHDP (Package EW-II AS-15) AS15

7

M/s Ksheeraabd Constructions Pvt Ltd (KCPL)

Construction of Existing Carriageway from 190 Km to 218.215 Km on Trichy Karur Section of National Highway No 67, in the state of Tamil Nadu - Dispute between KCPL Vs VNC KCPL vs VNC

8

M/s KNR-Patel (JV)

Four laing of Nellore Kavali section of NH-5 in the state of Andhrapradesh AP11

9

M/s TBPR Infra Projects Pvt Ltd

Civil & Structural works for offsites (Part -B) for onshore Gas Terminal at Mallavaram, Andhra Pradesh for Deen Dayal Field Development Project of M/s Gujarat State Petroleum Corporation Ltd Mallavaram

10

M/s KNR Walayar Tollways Pvt Ltd

Four laning of Walayar - Vadakkancherry section in Kerala (Km 182.250 to Km 240.000 of NH-47) - Package NS-2/ BOT/KL-2 - on DBFOT (Toll) basis under NHDP Ph II in the State of Kerala KL2

11

M/s Bhrunda Infra Private Limited

Package-I: Construction of Phase-I works comprising Earth work, PCC, RCC works, Bore well etc for Research lab with R&D office, Hostel Block including Guest House, Type III Residential quarters, Animal House, Security Lodge, Animal farms for National Institute of Animal Biotechnology (NIAB) at Hyderabad.
Package-II: Construction of Phase-1 comprising Research Lab with R&D office, Hostel Block including Guest House, Security Lodge, Animal Farms, Animal House including associated works for National Institute of Animal Biotechnology (NIAB) at Hyderabad.
Package-III: Construction of Internal Roads in NIAB Campus, Gachibowli, Hyderabad.
NIAB Pkg 1 & 2 & Campus, Hyderabad

12

D.P Jain & Co. Infrastructure Pvt Ltd

Design, Build, Finance Operation, Maintain and Transfer (DBFOMT) of the existing State Highway from Bidar - Ekhelli (NH-9)-Chincholi (Approx, length 60.040 kms) in the State of Karnataka Bidar-Ekhelli-Chincholi

13

D.P Jain & Co. Infrastructure Pvt Ltd

Widening to Two/Four Lane with Paved shoulders from Km.79.650 to Km.118.470 End of Yadgir bypass to Andhra border section of NH 150 in the state of Karnataka Yadgiri Bypass to Andhra Border